CURRENT TANK REFURBISHMENTS

 

TK3 13X14 TANK REFURBISHMENT

 

Works include:

  • Sand Blasting Pre-Inspections
  • Various internal repairs
  • Baffle & Launder repairs
  • Fabrication and replacement of 600NB x 7 meter down comer
  • Ultra High Pressure waterblasting to remove existing damaged tank lining
  • Surface Treatment to tank internals with POLYUREA coating and Dulux GFX

TK3 9 X 9 TANK REFURBISHMENT 

 

Works include:

  • Sand Blast Pre-Inspection
  • Installation of new floor
  • Installation of new Baffles
  • Internal structural re-skin of lower half of tank
  • Repairs to launders & access points
  • Repairs to AGI blades (coated in POLYUREA)
  • Surface Treatment to tank internals with POLYUREA coating

PREVIOUS TANK WORKS

 

TK2 13X14 TANK REFURBISHMENT

 

Works include:

  • HP water blast for inspection
  • Various floor repairs
  • Various internal wall repairs
  • Fabrication and replacement of 600NB x 7 meter down comer
  • Repairs to current coating with POLYUREA

TK2 13X14 TANK REFURBISHMENT

 

Works include:

  • Installation of new false floor
  • Replacement of existing baffles
  • Repairs to various sections of the tank internals & externals
  • Repairs to seam welds through out the tank internals
  • removal on top 3M internal second skin and fully weld
  • Degrease and HP water blast of tank internals
  • Surface treatment of tank internals with POLYUREA

 

TK1 13X14 FLOOR REPLACEMENT 

 

Works included:

  • Sand blast for inspection
  • Fabrication of new floor
  • Removal of existing floor
  • Installation of entire new floor 
  • Installation of air sparges
  • Surface treatment to the floor and 1M up the internal walls
  • Sealing of external tank base with a polyurethane sealant and surface treatment with Dulux STE glass flake

TK4 GEARBOX STRUCTURAL STEEL REPLACEMENT

 

Works included:

  • Sand blast for inspection
  • NDT inspection
  • Workshop Fabrication of new gearbox steel work
  • Removal of existing structural steel
  • Installation of new structural steel 
  • NDT examination to 100% of welds
  • Surface Treatment of new steel work

TK14 8X9 REFURBISHMENT

 

Works included:

  • Sand blasting for inspection
  • Removal of existing polybrit surface treatment
  • Steel refurbishment including reskinning the bottom strake due to large areas of corrosion, re-skinning the top 1.5 meters of the tank strake again to large areas of corrosion
  • Extensive baffle replacement
  • Floor repairs, Launder repairs & Down comer repairs
  • Surface treatment of the entire tank included a full blast and coating of Dulux STE glass flake

TK7 DRAFT TUBE REPLACEMENT

 

Works included:

  • Removal of top of tank steel work
  • Removal of existing Draft tube in 2 x sections due to corrosion
  • Fabrication of new draft tube
  • Surface treatment to new draft tube
  • General steel repairs and seam weld repairs to TK7 internals
  • Surface Treatment of TK7 internals with STE glass flake
  • Installation of the new draft tube
  • Reinstate top of tank steel work